Skylight Blackout Spray Painting for Temporary Theatre
Sage and Jester required a temporary blackout solution for skylights in a large warehouse at Deptford Store House, as the space was being transformed into a temporary theatre. The goal was to completely block out natural light while ensuring the coating could be easily removed in six months when the building lease ended.

A detailed visual showcase of this specific project
Request a Tailored Quotation.

Burger King Roof
Deptford, London
3 days
2,100 m²
2025
Project Challenges & Solutions
Achieving a Removable Blackout Solution
- The client needed full light blockage, but the paint had to be peelable for easy removal after six months.
- Solution: We used Mipa Peelable Booth Coating as a base layer, followed by a high-build vinyl topcoat for enhanced durability.
High Paint Consumption Due to Colour Choice
- The client opted for a lighter colour rather than full black, which required significantly more paint to achieve complete light blockage.
- Solution: We meticulously applied multiple coats to ensure 100% blackout coverage.
Height & Access Challenges
- The skylights were positioned at a steep angle, ranging from 9m to 15m high, making access difficult.
- Solution: Our IPAF-certified team used scissor lifts, ensuring safe and efficient coverage at all angles.
Strict Three-Day Completion Deadline
- The client’s timeline was non-negotiable, with only three days available before theatre equipment installation.
- Solution: We operated in shifts with 10 operatives working 12-hour days, ensuring timely completion without compromising quality.
Health & Safety Considerations
- Working at height and prolonged exposure to spray coatings required strict safety protocols.
- Solution: We implemented full RAMS (Risk Assessments & Method Statements), used PPE and respiratory protection, and conducted daily safety briefings.
The Process
Step 1: Site Preparation & Safety Measures
- Full risk assessment and method statement (RAMS) compliance.
- Deployment of scissor lifts for safe access to the skylights.
- Team briefing on safe handling of spray equipment and coatings.
Step 2: Application of Peelable Base Coat
- Mipa Peelable Booth Coating was applied as a removable base layer.
- Ensured even coverage for easy removal after six months.
Step 3: High-Build Vinyl Topcoat for Complete Blackout
- Applied multiple layers to ensure total light blockage.
- Adjusted spray technique to accommodate the sloped skylight angles.
Step 4: Final Inspection & Client Approval
- Conducted light tests to confirm zero natural light penetration.
- Completed within the three-day deadline and received client sign-off with high praise.
The Results
100% blackout achieved, transforming the warehouse into a theatre-ready environment.
Fully removable coating, ensuring no permanent changes to the building.
Flawless execution under tight time constraints, thanks to 10-man shifts working 12-hour days.
Safe & compliant completion, following IPAF and CHAS safety regulations.
Why Sage and Jester Chose Us
Specialists in Temporary Blackout Solutions – Proven expertise in light-blocking coatings.
Fast Turnaround with No Compromises – Delivered within the strict three-day deadline.
Safe & Certified High-Level Spray Painting – IPAF-trained team working at up to 15m high.
Custom Removable Coating Solution – Ensured easy removal after lease expiration.
Need a Temporary Blackout or Removable Coating Solution?
We specialise in industrial spray coatings, blackout solutions, and temporary protective finishes for warehouses, theatres, film studios, and commercial spaces.
Keyword Focus
- Industrial skylight blackout coating
- Warehouse blackout spray painting
- Peelable coatings for commercial buildings
- Temporary blackout solutions for theatres
- High-access spray painting for skylights
- Mipa Peelable Booth Coating application
- Large-scale spray painting contractors UK

projects

Deptford Store House
Temporary skylight blackout coating for a warehouse theatre conversion

Barbican Art Gallery Ceiling Blackout
Ceiling blackout and restoration works for a film projection exhibition

2 Evelyn Street Aluminium Frame Transformation
External aluminium window frame spraying for a Deptford commercial property