Skylight Blackout Spray Painting for Temporary Theatre

Sage and Jester required a temporary blackout solution for skylights in a large warehouse at Deptford Store House, as the space was being transformed into a temporary theatre. The goal was to completely block out natural light while ensuring the coating could be easily removed in six months when the building lease ended.

Burger King Roof
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us

Request a Tailored Quotation.

Share your contact details along with a brief outline of the project. Our team will be in touch to gather any additional information or arrange a site survey if required. From there, we'll prepare a tailored quotation, with fast turnaround times to keep your project moving.
“NuColour handled our commercial cladding spraying at Sheperton Studios with unmatched professionalism and skill. Thank you!”
— Bruce Isaac
SIGNS OF SUCCESS
Full Name
Email
Business
Phone
Post Code
Message
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
We'll reply within 24h.

By sending, you accept our Privacy Policy.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
“NuColour handled our commercial cladding spraying at Sheperton Studios with unmatched professionalism and skill. Thank you!”
— Bruce Isaac
SIGNS OF SUCCESS
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Quote icon

client review
About

Burger King Roof

Location

Deptford, London

Project duration

3 days

Area

2,100 m²

Year

2025

Project Challenges & Solutions

Achieving a Removable Blackout Solution

  • The client needed full light blockage, but the paint had to be peelable for easy removal after six months.
  • Solution: We used Mipa Peelable Booth Coating as a base layer, followed by a high-build vinyl topcoat for enhanced durability.

High Paint Consumption Due to Colour Choice

  • The client opted for a lighter colour rather than full black, which required significantly more paint to achieve complete light blockage.
  • Solution: We meticulously applied multiple coats to ensure 100% blackout coverage.

Height & Access Challenges

  • The skylights were positioned at a steep angle, ranging from 9m to 15m high, making access difficult.
  • Solution: Our IPAF-certified team used scissor lifts, ensuring safe and efficient coverage at all angles.

Strict Three-Day Completion Deadline

  • The client’s timeline was non-negotiable, with only three days available before theatre equipment installation.
  • Solution: We operated in shifts with 10 operatives working 12-hour days, ensuring timely completion without compromising quality.

Health & Safety Considerations

  • Working at height and prolonged exposure to spray coatings required strict safety protocols.
  • Solution: We implemented full RAMS (Risk Assessments & Method Statements), used PPE and respiratory protection, and conducted daily safety briefings.

The Process

Step 1: Site Preparation & Safety Measures
  • Full risk assessment and method statement (RAMS) compliance.
  • Deployment of scissor lifts for safe access to the skylights.
  • Team briefing on safe handling of spray equipment and coatings.
Step 2: Application of Peelable Base Coat
  • Mipa Peelable Booth Coating was applied as a removable base layer.
  • Ensured even coverage for easy removal after six months.
Step 3: High-Build Vinyl Topcoat for Complete Blackout
  • Applied multiple layers to ensure total light blockage.
  • Adjusted spray technique to accommodate the sloped skylight angles.
Step 4: Final Inspection & Client Approval
  • Conducted light tests to confirm zero natural light penetration.
  • Completed within the three-day deadline and received client sign-off with high praise.

The Results

100% blackout achieved, transforming the warehouse into a theatre-ready environment.
Fully removable coating, ensuring no permanent changes to the building.
Flawless execution under tight time constraints, thanks to 10-man shifts working 12-hour days.
Safe & compliant completion, following IPAF and CHAS safety regulations.

Why Sage and Jester Chose Us

Specialists in Temporary Blackout Solutions – Proven expertise in light-blocking coatings.
Fast Turnaround with No Compromises – Delivered within the strict three-day deadline.
Safe & Certified High-Level Spray Painting – IPAF-trained team working at up to 15m high.
Custom Removable Coating Solution – Ensured easy removal after lease expiration.

Need a Temporary Blackout or Removable Coating Solution?

We specialise in industrial spray coatings, blackout solutions, and temporary protective finishes for warehouses, theatres, film studios, and commercial spaces.

Keyword Focus
  • Industrial skylight blackout coating
  • Warehouse blackout spray painting
  • Peelable coatings for commercial buildings
  • Temporary blackout solutions for theatres
  • High-access spray painting for skylights
  • Mipa Peelable Booth Coating application
  • Large-scale spray painting contractors UK

Burger King Roof
more

projects

Deptford Store House

Deptford Store House

plus icon

Temporary skylight blackout coating for a warehouse theatre conversion

Deptford Storehouse
2025
Barbican Art Gallery Ceiling Blackout

Barbican Art Gallery Ceiling Blackout

plus icon

Ceiling blackout and restoration works for a film projection exhibition

Barbican, London
2025
2 Evelyn Street Aluminium Frame Transformation

2 Evelyn Street Aluminium Frame Transformation

plus icon

External aluminium window frame spraying for a Deptford commercial property

Deptford, London
2025