Temporary skylight blackout coating for a warehouse theatre conversion

A fast-track blackout coating project for a Deptford warehouse being converted into a temporary theatre, delivered at height within a tight three-day programme.

Deptford Store House
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us

Request a Tailored Quotation.

Share your contact details along with a brief outline of the project. Our team will be in touch to gather any additional information or arrange a site survey if required. From there, we'll prepare a tailored quotation, with fast turnaround times to keep your project moving.
“NuColour handled our commercial cladding spraying at Sheperton Studios with unmatched professionalism and skill. Thank you!”
— Bruce Isaac
SIGNS OF SUCCESS
Full Name
Email
Business
Phone
Post Code
Message
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
We'll reply within 24h.

By sending, you accept our Privacy Policy.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
“NuColour handled our commercial cladding spraying at Sheperton Studios with unmatched professionalism and skill. Thank you!”
— Bruce Isaac
SIGNS OF SUCCESS
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Get in touch with us
Quote icon

NuColour delivered exactly what we needed within an extremely tight timeframe. The blackout coating performed perfectly, communication was excellent throughout, and the team worked professionally from start to finish.

Jessica

Sage and Jester

client review
About

Deptford Store House

Location

Deptford Storehouse

Project duration

3 Days

Area

14 Skylights al 18m x 8m each

Year

2025

Project Challenges and Solutions

Removable blackout requirement
The brief called for full light exclusion without permanently altering the building fabric. To achieve this, the skylights were prepared with a peelable base coating before a high-build vinyl topcoat was applied to create the blackout effect. This gave the client the performance they needed for the theatre period while keeping future removal straightforward.

Coverage and colour depth
Because the selected finish was lighter than a standard black blackout coating, the skylights required careful build-up to stop light transmission. Multiple coats were applied methodically until the team achieved complete, even coverage across each pane.

Working at height
The skylights measured around 18m by 8m and sat on a sloped roof line, with working heights ranging from roughly 9m to 15m. IPAF-trained operatives used scissor lifts to reach the full surface safely and maintain consistent application across the angled sections.

Three-day programme
The theatre fit-out schedule left only a short window before equipment installation began. A ten-person team worked extended shifts over three days, allowing preparation, coating and inspection to be completed without compromising the finish.

Health and safety
Spraying at height in a large warehouse environment required tight controls. RAMS were agreed before work started, with appropriate PPE, respiratory protection, access planning and daily briefings in place throughout the project.

Process

The team began by preparing the work area, setting out access equipment and confirming the safety plan. Once the skylights were ready, a peelable base layer was applied to support later removal. The blackout coating was then built up in controlled passes, with the spray technique adjusted for the roof angle and the scale of the glazing.

After application, the team carried out light checks and a final inspection to confirm the skylights were fully blacked out. The work was completed within the agreed three-day window and handed over ready for the temporary theatre installation.

Results

The warehouse was transformed into a theatre-ready space with complete daylight control through the skylights. The coating system delivered the blackout performance required while remaining removable, protecting the building from permanent alteration. The project was completed safely, on time and under a demanding programme, with the client receiving a clean, practical solution for a temporary venue.

Project Challenges & Solutions

Achieving a Removable Blackout Solution

  • The client needed full light blockage, but the paint had to be peelable for easy removal after six months.
  • Solution: We used Mipa Peelable Booth Coating as a base layer, followed by a high-build vinyl topcoat for enhanced durability.

High Paint Consumption Due to Colour Choice

  • The client opted for a lighter colour rather than full black, which required significantly more paint to achieve complete light blockage.
  • Solution: We meticulously applied multiple coats to ensure 100% blackout coverage.

Height & Access Challenges

  • The skylights were positioned at a steep angle, ranging from 9m to 15m high, making access difficult.
  • Solution: Our IPAF-certified team used scissor lifts, ensuring safe and efficient coverage at all angles.

Strict Three-Day Completion Deadline

  • The client’s timeline was non-negotiable, with only three days available before theatre equipment installation.
  • Solution: We operated in shifts with 10 operatives working 12-hour days, ensuring timely completion without compromising quality.

Health & Safety Considerations

  • Working at height and prolonged exposure to spray coatings required strict safety protocols.
  • Solution: We implemented full RAMS (Risk Assessments & Method Statements), used PPE and respiratory protection, and conducted daily safety briefings.

The Process

Step 1: Site Preparation & Safety Measures
  • Full risk assessment and method statement (RAMS) compliance.
  • Deployment of scissor lifts for safe access to the skylights.
  • Team briefing on safe handling of spray equipment and coatings.
Step 2: Application of Peelable Base Coat
  • Mipa Peelable Booth Coating was applied as a removable base layer.
  • Ensured even coverage for easy removal after six months.
Step 3: High-Build Vinyl Topcoat for Complete Blackout
  • Applied multiple layers to ensure total light blockage.
  • Adjusted spray technique to accommodate the sloped skylight angles.
Step 4: Final Inspection & Client Approval
  • Conducted light tests to confirm zero natural light penetration.
  • Completed within the three-day deadline and received client sign-off with high praise.

The Results

  • 100% blackout achieved, transforming the warehouse into a theatre-ready environment.
  • Fully removable coating, ensuring no permanent changes to the building.
  • Flawless execution under tight time constraints, thanks to 10-man shifts working 12-hour days.
  • Safe & compliant completion, following IPAF and CHAS safety regulations.

Why Sage and Jester Chose Us

Specialists in Temporary Blackout Solutions – Proven expertise in light-blocking coatings.
Fast Turnaround with No Compromises – Delivered within the strict three-day deadline.
Safe & Certified High-Level Spray Painting – IPAF-trained team working at up to 15m high.
Custom Removable Coating Solution – Ensured easy removal after lease expiration.

Need a Temporary Blackout or Removable Coating Solution?

We specialise in industrial spray coatings, blackout solutions, and temporary protective finishes for warehouses, theatres, film studios, and commercial spaces.

Keyword Focus
  • Industrial skylight blackout coating
  • Warehouse blackout spray painting
  • Peelable coatings for commercial buildings
  • Temporary blackout solutions for theatres
  • High-access spray painting for skylights
  • Mipa Peelable Booth Coating application
  • Large-scale spray painting contractors UK

A Specialist Solution Delivered Under Pressure

This project demonstrated our ability to deliver bespoke coating solutions within demanding timeframes. By combining specialist products, experienced operatives, and careful planning, we transformed the warehouse into a fully blackout theatre environment while ensuring the coating could be safely removed after the event.

Deptford Store House
more

projects

Burger King Roof

Burger King Roof

plus icon

Skylight Blackout Spray Painting for Temporary Theatre

Deptford, London
2025
Barbican Art Gallery Ceiling Blackout

Barbican Art Gallery Ceiling Blackout

plus icon

Ceiling blackout and restoration works for a film projection exhibition

Barbican, London
2025
2 Evelyn Street Aluminium Frame Transformation

2 Evelyn Street Aluminium Frame Transformation

plus icon

External aluminium window frame spraying for a Deptford commercial property

Deptford, London
2025